Warning: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in ..../includes/class_bbcode.php on line 2968
Air scribe?
Bulltear Ad
Results 1 to 5 of 5

Thread: Air scribe?

  1. #1
    Helpfull BT forum member Swabie
    Join Date
    Dec 2013
    Location
    Saskatchewan, Canada
    Posts
    46

    Air scribe?

    Adding an air scribe would be nice, I haven't been able to find much info on mounting one on a Bulltear table.
    You did mention somewhere you were working on one, do you have a kit?
    Do you have pics of one mounted? Are the mounting points behind the Mag Lok (the slots with the 3 threaded holes on each side) something to do with the scribe setup?
    Thanks

  2. #2
    Thank you from BT ULTIMUS MAXIMUS STATUS jeepsr4ever's Avatar
    Join Date
    Dec 2002
    Location
    Minnesota
    Posts
    10,042
    Kit will be available soon. We keep getting components from different vendors to see who can supply quality and consistancy. There is a great build up that was done cheaply by one of the first guys to have a 2012 system back in late 2011. His name is RalfXJ here on the board. Look him up he can give you all the part numbers and info.
    [COLOR=#000000]
    Featuring www.StarLabCNC.com[/URL] for CNC plasma machines
    1-651-433-3689 TOLL FREE 1-855-433-3689

  3. #3
    Helpfull BT forum member Swabie
    Join Date
    Sep 2013
    Location
    Motown
    Posts
    37
    i'm setting a scribe up on our table right now. i have $80 in it so far. needed to order a regulator for down pressure, it should be here in a couple of week (from china). once i get it working, i'll post up my results in my thread.
    bulltear 4x8 turn key table w/dthc, rotary tube cutting head, mach3 bladerunner, hypertherm powermax 65

  4. #4
    Helpfull BT forum member Swabie
    Join Date
    Dec 2013
    Location
    Saskatchewan, Canada
    Posts
    46
    Sounds good, looking forward to see what you came up with.

  5. #5
    Helpfull BT forum member Swabie
    Join Date
    Sep 2013
    Location
    Motown
    Posts
    37
    f_armer: check my build thread for info on my $100 scribe setup
    price went up because i added a $10 air regulator for down pressure
    bulltear 4x8 turn key table w/dthc, rotary tube cutting head, mach3 bladerunner, hypertherm powermax 65

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Bulltear Ad