Linear rails should be greased every 50 hours on the Y axis and every 200 hours on the Z axis. Ballscrew every 200 hours.
Specific grease fitting for Y axis linear way trucks
http://www.toolsource.com/lube-link-...-p-144782.html
X axis rails should be wiped with cloth damp with WD40 twice weekly